The site of the new state-of-the-art stadium in Paramatta had a significant legacy of environmental contamination as a former dumping ground for waste materials. Senversa was part of a team responsible for developing the remedial scheme for the site impacted by approx. 20,000 m3 of soils contaminated with predominantly asbestos. The remedial works were incorporated into the design of the new stadium and implemented as an integrated element of the development, specifically, soil excavated from eight known contaminated areas was capped as engineered fill in designated locations under the proposed main stands. The stadium is due to opened in mid 2019.